Action at Last!
The new side stand bracket from Overland Solutions has been welded onto the frame at what I hope is the correct angle. I took measurements from the red GS before I sold it and applied them to this frame.
Local company, Metal Concept, did the weld very nicely and for next to nothing.
All the various parts of the frame, subframe, stands, fairing mount and top and bottom triple clamps are now ready for transport to the powder coaters.
Turnaround time is supposed to be a week to 10 days.